Drill It Underground is an Australian owned Horizontal Directional Drilling (HDD) company, specialising in:
telecommunications
sewer
power
water
gas
We are proud of our reputation for high quality work, cleanliness, safety, and reliable delivery within set deadlines.
Drill It Underground has capabilities to carry out a range of civil works required including installation of pits, trenching, locating, excavation, hydro vac for safe location of services etc.
We have a Ditch Witch JT3020AT Drill rig along with 8000 litre water storage available, to accompany a 11,000 litre hydro vac unit, meaning we can spend more time working and less time refilling with water and disposing of mud.
“Your lads have been very busy in my small and quiet street... since last week. I want to pass on my compliments for their quiet, thorough and completely professional approach. I have never seen construction or drilling done with such care and cleanliness. .. Congratulations on employing one of the best and most considerate construction crews I have ever seen working...”
About US
At Drill It Underground, we strive and pride ourselves on delivering high quality standard of works and prioritise safety. We can succeed in a challenging environment through our extensive experience in the construction industry and we are dedicated to the ongoing training and development of our team.
Drill it Underground strives to meet and exceed all client and Government environmental expectations and requirements. Environmental responsibility plays a major role in the day to day operations of the business.
We are a family-owned and operated business based in Bermagui, NSW and travel to jobs nationally.
Safety and Accreditation
AS/NZS 4801- 2001 – Occupational Health and Safety Management Systems
ISO25001 : 2018 – Occupational Health and Safety Management Systems
NSW WHS Act 2011 and WHS Regulations 2017; and
Victorian WHS Act 2004, WHS Regulations 2017.
Drill It Underground follow an environmental, work health & safety and quality management system to ensure we are given best chance to carry out the required work in a safe manner.
THE PROCESS
Step 1
Pilot Shot
Starting at the entry point, a drill head suitable for the ground conditions, is drilled along a predetermined route with depth and alighnment monitored continously.
Step 2
REAMING PROCESS
The pilot shot is enlarged in suitable steps, by back-reaming the hole with reamers designed for the ground conditions, to a size that accommodates the pipe to be installed.
Step 3
PIPE INSTALLATION
Once the drill rod string is connected to the pipe via a swivel, pull back commences. In some instances the pipe can be pushed into place.